Lynwood Senior High School

The construction of new teaching blocks to Lynwood Senior High School reached practical completion in September 2023. The design of the new teaching blocks commenced in mid 2021 and the project scope consisted of construction of four new teaching blocks and a gym within an existing public high school, one of the teaching blocks consisted of a performing arts theatre while the others consisted of staff offices and general learning areas.

My scope of works (design & documentation) for this project can be summarised as follows:

  • Due diligence reporting during design phase

  • Probable order of costing

  • Maximum Demand calculation to determine existing site capacity

  • Cable sizing calculations using PowerCAD software

  • Digital lighting control system

  • Energy management system

  • Liaison with architect during design phase and construction phase to coordinate services

  • New underground site infrastructure, such as extra low voltage, low voltage & fibre optic cabling

  • Lighting calculations for interior lighting (to AS 1680) and carpark lighting (to AS 1158)

  • General power & communication services in accordance with Department of Education room design brief

  • Liaison with site stakeholders

  • Design & Documentation of new stage performance services

  • Liaison with consulting team during for the duration of the project

  • Continued liaison with contractor during construction for a successful project delivery

#lightingdesign #cablesizing #maximumdemand #emergencylighting #communications #electrical #electricalconsulting #intruderdetection #DepartmentofEducation #lightingcontrolsystem #Stagelighting #TheatreAV #Qualified #Reliable