Piara Waters Senior High School - Stage 1

Craig Lougheed | Electrical Consultant | Qualified | Reliable

Piara Waters Senior High School reached practical completion in 2023..

The construction of Piara Waters Senior High School reached practical completion in 2023, however the project design commenced in mid 2019. The project scope consisted of the construction of an entirely new public high school. My scope of works (design & documentation) for this project can be summarised as follows:

  • Maximum Demand calculation and liaison with Western Power for the new point of supply (Transformer)

  • New transformer and site main switchboard

  • Cable sizing calculations using PowerCAD software

  • 70kW Solar system

  • Digital lighting control system

  • Energy management system

  • Sound systems to sports hall & drama/dance studios

  • Fire detection system in accordance with AS1670.1

  • Security detection system

  • Fire pump (safety services) equipment

  • New underground site infrastructure, such as extra low voltage, low voltage & fibre optic cabling

  • Lighting calculations for interior lighting (to AS1680) and carpark lighting (to AS1158)

  • General power & communication services in accordance with Department of Education room design brief

  • Liaison with consulting team during for the duration of the project

  • Continued liaison with contractor during construction for a successful project delivery

#lightingdesign #cablesizing #maximumdemand #emergencylighting #communications #electrical #electricalconsulting #WesternPower #firedetection #intruderdetection

Read More
Education, Local Government Craig Lougheed Education, Local Government Craig Lougheed

Joseph Banks Senior High School

Craig Lougheed | Electrical Consultant | Qualified | Reliable

The new Western Australia Space Science Education Centre at Joseph Banks Senior High School was completed in 2023..

The Western Australian space Science Education Centre, additional double storey teaching block at Joseph Banks Senior High School commenced design in 2020 and reached practical completion in mid-2023. The project scope consisted of the construction the Space Science Education Centre and some minor refurbishments to existing classrooms. Overall the team delivered a successful project, which will become a fun and interactive learning facility for our future astronauts!

My scope of works (design & documentation) for this project can be summarised as follows:

  • Due diligence reporting during design phase

  • Probable order of costing

  • Maximum Demand calculation to determine existing site capacity

  • New main switch within existing site main switchboard

  • Cable sizing calculations using PowerCAD software

  • Digital lighting control system

  • colour changing lighting system within cyber security classrooms

  • Energy management system

  • Security detection system

  • New underground site infrastructure, such as extra low voltage, low voltage & fibre optic cabling

  • Lighting calculations for interior lighting (to AS 1680) and carpark lighting (to AS 1158)

  • General power & communication services in accordance with Department of Education room design brief

  • Additional ICT requirements for cyber security teaching

  • Liaison with consulting team during for the duration of the project

  • Continued liaison with contractor during construction for a successful project delivery

#lightingdesign #cablesizing #maximumdemand #emergencylighting #communications #electrical #electricalconsulting #intruderdetection #DepartmentofEducation #lightingcontrolsystem #Qualified #Reliable

Read More
Education, Local Government Craig Lougheed Education, Local Government Craig Lougheed

Lynwood Senior High School

Craig Lougheed | Electrical Consultant | Qualified | Reliable

The new teaching blocks at Lynwood Senior High School were completed in 2023..

The construction of new teaching blocks to Lynwood Senior High School reached practical completion in September 2023. The design of the new teaching blocks commenced in mid 2021 and the project scope consisted of construction of four new teaching blocks and a gym within an existing public high school, one of the teaching blocks consisted of a performing arts theatre while the others consisted of staff offices and general learning areas.

My scope of works (design & documentation) for this project can be summarised as follows:

  • Due diligence reporting during design phase

  • Probable order of costing

  • Maximum Demand calculation to determine existing site capacity

  • Cable sizing calculations using PowerCAD software

  • Digital lighting control system

  • Energy management system

  • Liaison with architect during design phase and construction phase to coordinate services

  • New underground site infrastructure, such as extra low voltage, low voltage & fibre optic cabling

  • Lighting calculations for interior lighting (to AS 1680) and carpark lighting (to AS 1158)

  • General power & communication services in accordance with Department of Education room design brief

  • Liaison with site stakeholders

  • Design & Documentation of new stage performance services

  • Liaison with consulting team during for the duration of the project

  • Continued liaison with contractor during construction for a successful project delivery